Simple to install.

1.

Simply install your vertical power strips to each cabinet.
  

2. Mount the RPDU in the desired location on your rack system.
  
3.

Install one electrical circuit from the UPS or power source to the RPDU.

The RPDU is ready to distribute power to the racks

   

    
UP to 33 KVA plug and play load power connection:

1.

Simply install your vertical power strips to each cabinet.
  

2. Run the power strip cord to the RPDU and plug it in one of the receptacles located on the back of the RPDU.
  
3.

Turn on the corresponding circuit breaker.
  

Monitor and control your load closely:

1.

The RPDU is equipped with an advanced power monitor that provides KWH, KW, KVA, KVAR, Amps and voltage per phase.
  

2. The monitor will transmit all readings via infrared port to a Palm Pilot Organizer, then to an Excel spreadsheet for record keeping and management.